Board approvals, elevator bookings, noise hours, and compact layouts — condo kitchens are a discipline of their own, and they are ours.
A condo kitchen renovation is as much paperwork and logistics as it is construction. Boards require drawings, insurance certificates, and contractor approval before anything starts. Work hours are fixed, elevators are booked, and materials arrive through a loading dock on a schedule. We have run this playbook across hundreds of Toronto buildings — your property manager will not be teaching us anything new.
Plumbing stacks and shear walls decide what can move in a condo, and the honest answer is: less than a house, more than you think. Sinks can often shift along the same wall, islands and peninsulas can be added where the floor plan allows, and ventilation can almost always be dramatically improved. We tell you what the building will and will not allow before you fall in love with a layout.
Compact kitchens reward millwork obsession: full-height uppers, appliance garages, pull-out pantries, drawer-in-drawer storage. A 9-foot condo kitchen with proper custom cabinetry out-stores most suburban kitchens twice its size.
Most condo kitchens take three to four weeks inside the unit. Demolition and cutting land early in the schedule and inside permitted hours; we protect corridors, book elevators, and keep the concierge informed — quiet neighbours are part of the deliverable.